Set the subframe adapter (VSB02C000016) on a transmission jack (A), line up the slots in the arms with the bolt holes on the corner of the jack base, and tighten the bolts.
2.
Attach the subframe adapter to the front subframe (B).
Attach a chain hoist (A) to the universal lifting eyelet and the transmission hanger (B), then lift the engine/transmission until it is securely supported by the chain hoist.
43.
Transmission Mount Bracket Mounting Bolt and Nut - Remove
44.
Engine - Remove
1.
Check that the engine/transmission is completely free of the vacuum hoses, the fuel hoses, the coolant hoses, and the electrical wiring.
2.
Slowly lower the engine/transmission about 150 mm (5.91 in). Check once again that all the hoses and the electrical wiring are disconnected and free from the engine/transmission, then lower it all the way and support it.
3.
Remove the chain hoist from the engine/transmission.
4.
Raise the vehicle, and remove the engine/transmission from under the vehicle.
Position the engine/transmission assembly under the vehicle, and be sure that they are properly positioned. Carefully lower the vehicle, and stop with the installation position of the engine/transmission assembly.
4.
Chain Hoist - Install
1.
Attach a chain hoist (A) to the universal lifting eyelet and the transmission hanger (B), then lift the engine/transmission until it is securely supported by the chain hoist.
5.
Transmission Mount Bracket Mounting Bolt and Nut - Loosely Install
6.
Engine - Support
1.
Lift and support the engine with a jack and a wood block under the oil pan.
Set the subframe adapter (VSB02C000016) on a transmission jack (A), line up the slots in the arms with the bolt holes on the corner of the jack base, and tighten the bolts.
2.
Attach the subframe adapter to the front subframe (B).
Turn the vehicle to the ON mode, but do not start the engine. After the fuel pump runs for about 2 seconds, the fuel line will be pressurized. Repeat this two or three time, then check for fuel leakage.